SCHEME DOCUMENTS

Required documents for the scheme's operation are made available below.

To download a document do one of the following:

Windows PC - 'Right-Click' on symbol and hold, then select appropriate action from dialogue box.

Macintosh PC - 'Control-Click' on symbol and hold, then select appropriate action from dialogue box.





SCHEME REGULATIONS

Sets out the regulations governing the ACRS Product Certification Scheme.

They must be read in conjunction with the Application Form.

Updated February 08



ANCILLARY SITES POLICY

Sets out the policy for ACRS certification of ancillary sites.

It should be read in conjunction with the Scheme Regulations.

Updated October 07


APPLICATION FORM

Includes both the initial application and declarations which must be resubmitted annually.

It must be read in conjunction with the Scheme Regulations.

Current Version: 0803
(Updated August 08)

INFORMATION FOR COLD-DRAWN BAR AND STRUCTURAL MESH MANUFACTURERS

Clarification from Standards Australia concerning properties of L-Grade materials used for structural meshes and concrete pipes to AS/NZS 4671.


LONG-TERM QUALITY REPORTING

Long-term quality results need to be reported quarterly for reinforcing bar, wire and mesh for each Firm location.

As of 1 January 2007:
31 December results are due 28 January
31 March results are due 28 April
30 June results are due 28 July
30 September results due 28 October.

INFORMATION FOR HOT-ROLLED BAR, COLD-DRAWN BAR AND STRUCTURAL MESH MANUFACTURERS

Clarification from Standards Australia concerning requirements of AS/NZS 4671 for all deformed steel reinforcing materials to possess unique markings identifying the manufacturer or processor.












































© 2006 ACRS Designed, Hosted, Maintained by: TECHMEDIA PUBLISHING PTY LTD